The KAPA 4700 Project satellite buildings — Building-2 North Extension, Building-1E, Building-2E, and Building-2K — developed for Mercedes-Benz Türk A.Ş. at the Istanbul-Hadımköy facilities were completed on a turnkey basis by DEA YAPI in 2014, covering construction, mechanical, and electrical works. The project was planned as a multi-building integrated investment supporting Mercedes-Benz Türk’s production ecosystem at Hadımköy.
The scope involved fabrication of load-bearing systems using 500 tons of steel structure, 950 m³ of concrete, and 650 tons of rebar. Roof and façade cladding, finishing works, and electrical-mechanical installations were executed end-to-end, enabling the simultaneous delivery of four separate satellite buildings. Parallel construction of multiple structures demanded a high level of engineering and management discipline in site logistics, labor planning, and supply chain coordination.
Mercedes-Benz Türk Hadımköy is one of the key production centers of Türkiye’s automotive OEM industry, playing a strategic role in both domestic and export manufacturing. Extension investments at a facility of this scale are critical for expanding production capacity and strengthening the supply chain. The steel frame load-bearing system provided ideal flexibility for the wide-span production and storage volumes.
Since 1988, DEA YAPI has delivered turnkey industrial building construction services to corporate investors, bringing the same technical discipline and multi-building project management expertise to this project.