The facility extension project developed for Mercedes-Benz Türk A.Ş. at the Hoşdere Facilities — covering Building 17, Building 1, and Building 3 landscape works, revisions to existing structures, and capacity expansion — was completed by DEA YAPI on a turnkey basis in 2019. The scope included reinforced concrete foundations, a steel frame canopy structure, and completion of waste management facilities for the Head Office (GM) and Marketing Center (PM) buildings.
Construction began with landscape and site works — drainage, infrastructure integration, and reconfiguration of existing building connections — followed by erection of the steel canopy structure over reinforced concrete foundations. The wide-span canopy protects logistics movements from weather conditions while allowing uninterrupted continuation of existing production flow. The waste management facilities at the GM and PM buildings were designed in full compliance with environmental regulations and waste management standards.
Executing simultaneous extension and revision works across multiple buildings within an active automotive facility requires advanced coordination in production continuity, occupational safety, and environmental management. Such works, carried out while existing buildings remain in operation, demand the discipline of an experienced contractor.
Since 1988, DEA YAPI has maintained a long-standing partnership with Mercedes-Benz Türk, bringing its technical expertise in industrial building construction to this extension project as well.