The Finish Building project developed for Mercedes-Benz Türk A.Ş. within the factory site was completed by DEA YAPI on a 3,900 m² covered area in 2008. The factory extension, designed with a steel frame load-bearing system on reinforced concrete foundations, along with revisions to the existing structure, was executed comprehensively under a unit-price contract.
The scope included foundation works using 780 m³ of concrete and 75 tons of rebar, and a superstructure built with 620 tons of steel structure — delivering a 7-meter clear height beneath the trusses for wide-span production volume. A 3,900 m² roof covering and 1,450 m² of façade cladding were applied over the steel column and roof system, while paint booth and utility gallery sections were also completed within scope. Air filtration, lighting, and floor flatness standards required for paint quality in automotive finish processes were meticulously maintained.
At the scale of automotive OEM production, finish lines are specialized facilities that demand precise environmental control — dust management, temperature-humidity regulation, and paint shop infrastructure. Steel structures are the preferred solution for these buildings, offering both wide spans and long-term durability.
Since 1988, DEA YAPI has applied its technical expertise from turnkey factory construction projects for Türkiye’s leading automotive manufacturers to the Mercedes-Benz Türk Finish Building project as well.