Industrial investments have two basic models: the traditional model, with separate contractors for each package, and the turnkey model under a single contract. The choice directly affects schedule, budget and risk allocation.
In short
For investments with a clear scope and a critical schedule, turnkey industrial building construction is usually more predictable. If the owner has a strong technical team and the project changes continuously, the traditional model may be preferable. Before deciding, put the scope and change management in writing.
Since 1988, DEA Yapı has delivered automotive, logistics and manufacturing investments on a turnkey basis.
| Criterion | Traditional model | Turnkey model |
|---|---|---|
| Contract structure | Several separate contracts | One contract |
| Coordination | Owner | Contractor |
| Budget predictability | Depends on package results | Fixed in the contract |
| Flexibility for changes | High | Managed (priced) |
| Responsibility for handover date | Shared | One counterpart |
Owners with strong technical teams who keep developing the project find flexibility in the traditional model. Owners with a critical schedule, a clear scope and a wish for one counterpart suit turnkey better. For scope examples see our industrial building construction guide.
Owner in the traditional model
Coordination between packages, schedule alignment, interface problems and managing many contracts rest with the owner.
Contractor in turnkey
Design-construction coordination, schedule and budget alignment, interface problems and handover responsibility pass to the contractor.
Owner in turnkey
Defining scope correctly, giving approvals on time and managing changes remain with the owner.
Shared risk areas
Ground surprises, changes in law and force majeure should be defined in the contract beforehand.
Define need and scope
Production capacity, area needs, quality level and budget framework are fixed.
Preliminary design and proposal
The contractor surveys and submits a preliminary design and budget proposal.
Contract
Scope, time, progress payments and change management are written into one contract.
Execution and approvals
Projects and material choices are executed after owner approval.
Testing, acceptance and handover
Systems are tested; the facility is taken into operation with a handover record.
The most frequent dispute in turnkey contracts is changes that arise during construction. A change request should be sent in writing; the contractor should price its cost and time impact; and execution should follow the owner’s approval. This keeps both budget and schedule under control.
Practical advice
Write the change procedure (request, pricing, approval, time impact) step by step into the contract; this markedly reduces later disputes.
In some projects design and construction are carried out by a single contractor. This approach raises the buildability of the design and shortens the project. The owner should keep approval and change rights during design clearly reserved in the contract.
Beyond scope, a turnkey contract should state handover criteria, test and acceptance procedure, delay and penalty terms, warranty period, insurance and force majeure definitions. Settling these up front instead of arguing about them later protects the flow of the project.
Turnkey does not mean the owner stays out of the process. The owner manages design approvals, material and system choices, progress-payment checks and acceptance. Fast, clear decisions directly support the schedule, and regular progress meetings make the collaboration easier.
Questions to answer before choosing a model
The answers usually show clearly which model suits. If most point to “clear scope, critical schedule, one counterpart”, turnkey stands out; if they point to “flexible scope, strong in-house team”, the traditional model may suit better.
A single-contractor model does not guarantee quality by itself; a quality control plan should be part of the contract. Material approvals, execution checks, sample and test results, the pre-handover acceptance procedure and warranty terms should be put in writing. The owner can monitor this with independent inspection or project-management support. Quality assurance turns the single-counterpart advantage of turnkey into a real guarantee.
Examples of projects we carried out under the turnkey model:
Let’s take the first step on your project
Share your plot, scope and target handover date and we will get back to you with a survey and proposal.